โ† Back to events

Project ยท May 20, 2026

Completed an offline-first HACCP reporting project

Digital logs, QR flows, unstable-connection scenarios and report exports for a production enterprise.

HACCP reporting and offline-first workflow diagram

Summary

We completed a project focused on digital HACCP logs and reporting for a food production enterprise. The client name is not disclosed until explicit public permission is granted.

What mattered

Some control zones can operate without stable connectivity. The system therefore needed to work in real operational conditions: a phone, a QR code at a control point, a log entry and later synchronization.

  • mobile workflow for employees;
  • offline-first behavior;
  • QR entry points for specific logs;
  • period-based report exports;
  • employee and administrator roles;
  • structured data for inspection workflows.

Why it matters for ACG

The project reflects our approach: we assemble not just an input form, but a controllable digital contour with roles, responsibility, reporting and operations.

HACCP reporting diagram

Materials and links

Discuss a similar task